tliv

Faculty Drive

Throughout the summer of 2021 Bowes Construction fixed faculty drive located off 6th This project included many elements such as removals, pipework, gravel laydown, dirt work, and paving. First off, the existing pavement was removed and hauled away to be recycled. Next Bowes Construction helped move dirt for removal of pipework. Once pipe was put

Faculty Drive Read More »

Parking Lot Paving Guide

At Bowes Construction we realize that it can be difficult to determine what kind of maintenance or construction may be needed to fix your parking lot. Here is a simplified guide to give you a better understanding about what kind of maintenance or construction may be required to fix your parking lot. This guide includes

Parking Lot Paving Guide Read More »

Brookings Business of the Month

The Brookings Area Chamber of Commerce is pleased to announce Bowes Construction, Inc. as the November 2021 Business of the Month! Founded in 1975 by Lyle and Marcia Bowes, the company has been serving Brookings and the surrounding communities for over 40 years in the road construction industry. In 2012, Lyle and Marcia’s children, Jason

Brookings Business of the Month Read More »

Larson’s Park

In September of 2021 Bowes Construction completed construction on Larson’s Park. This project encompassed a few different services. First off the road and parking lot was milled, meaning the top 2’’ of asphalt were removed. After the removal of the top layer, Bowes Construction overlayed the lot. The lot was overlayed with 2’’ of HMA.

Larson’s Park Read More »

Brookings Public Schools District Office

In September of 2021 Bowes Construction completed the construction of the Brookings Public Schools District Office. This project required a few services as the lot was a complete reconstruction. First removals took place, including the existing pavement, concrete gutter, and a few more elements. Next basecourse was added and graded to make a proper subgrade.

Brookings Public Schools District Office Read More »

Jay’s Auto Body Shop

In September of 2021 Bowes Construction completed parking lot and driveway construction for Jay’s Auto Body Shop just north of Arlington. First off site work preparation took place by adding base course and ensuring that the driveway and lot were ready to pave. Next 4” of HMA asphalt was laid. Bowes was happy about this

Jay’s Auto Body Shop Read More »

Brookings County Overlay

In October of 2021 Bowes Construction completed an overlay on 213th street between Brookings and Aurora South Dakota. This project was roughly a 3 mile span, and required multiple elements of construction. First the road was prepped and cleaned to get ready for the overlay. Once the road was prepped tack was laid. Next the

Brookings County Overlay Read More »

Madison Regional Airport

In August of 2021 Bowes Construction had the pleasure to work with the Madison Regional Airport. This job consisted of the utilization of a few different services. The goal for the project was to create another parking pad for planes and other airport transportation. First off, the site was cleared with an excavator and blade.

Madison Regional Airport Read More »

HWY 14 Turn Lanes

Throughout the summer of 2021 Bowes Construction accepted a public job lead by the South Dakota Department of Transportation. This job included the completion of three turn lanes on HWY 14. Two turn lanes were created just west of Brookings and three miles west of Volga. The third turn lane was completed just east of

HWY 14 Turn Lanes Read More »