Bowes Construction

Highway 100

The Highway 100 project was a large-scale, mass grading project south of Sioux Falls. This project consisted of grading, muck excavation, and unclassified excavation. This project lasted one season, however, it took multiple pieces of equipment including two graders, one bulldozer, and two quad tracks. Highway 100 ran a span of nearly 20 miles.  

Highway 100 Read More »

Highway 18

Highway 18 was a two-season 17-mile grading project for the SDDOT in Hutchinson and Turner counties. This project consisted of many services related to dirt work. First off, Bowes removed the original highway. Upon removal, Bowes completed muck excavation, option borrow excavation, and unclassified excavation reshaping the road. Next undercutting and grading took place to

Highway 18 Read More »

Brookings Airport

Award-winning work was done on the Brookings Airport job. The job was no small task and our paving turned out amazing! Bowes Construction in 2015 paved a large runway at Brookings County Regional airport. This project consisted of unclassified excavation and installation of base course and salvaged asphalt. Once the base course and recycled asphalt

Brookings Airport Read More »

Brookings Health System and Remodel

Brookings Health Systems have been expanding and therefore were in need of some parking lot assistance. This two year project involved a few different services from Bowes Construction. First off in 2019, initial construction went underway as Bowes Construction excavated, graded, trenched, and backfilled the ground to prepare it for paving. Next ¾” gravel base

Brookings Health System and Remodel Read More »

Scroll to Top