At Bowes Construction, we are thrilled to reflect on the successful completion of Interchange Exit 130 in Brookings, South Dakota. This two-year project has been a monumental undertaking, transforming a vital gateway to our city. Our team took on multiple critical roles, from grading and gravel laydown to material supply and asphalt paving. Each phase of construction was meticulously planned and executed, ensuring the highest quality and durability for this important infrastructure.

The grading process laid the groundwork for the entire project, literally and figuratively. It was essential to create a stable and level foundation that could support the heavy traffic anticipated at this interchange. Our skilled crew worked diligently, shaping the land to the precise specifications required. This was followed by the careful laydown of gravel, which provided an essential base layer that would enhance the strength and longevity of the asphalt paving.

Material supply was another key component of our responsibilities. We sourced and provided high-quality materials that met stringent standards, ensuring the structural integrity and safety of the interchange. Finally, the asphalt paving process brought the project to its culmination. Utilizing state-of-the-art equipment and techniques, we laid down smooth, durable asphalt that will withstand the test of time and heavy use, ensuring a safe and efficient passage for all travelers.

This project would not have been possible without the collaborative efforts of many dedicated professionals. We extend our heartfelt thanks to the engineers whose expertise and precision were invaluable, the subcontractors who brought specialized skills to the table, and the government officials who provided essential support and oversight. Together, we have created a vital infrastructure asset for the Brookings community, and we look forward to continuing our mission of building and enhancing the places we call home.

Scroll to Top