In July of 2021 Bowes Construction completed a large stretch of road. Bowes Construction performed an overlay on 223rd street. This road is right next to the Nunda exit and heads east. The road required a few different services. First off, the road was prepped properly for grade and approaches. Next the Bowes Construction paving crew, overlayed over 10 miles of road. It was a long hot process, but Bowes was able to tackle the project with no problem.