The Highway 100 project was a large-scale, mass grading project south of Sioux Falls. This project consisted of grading, muck excavation, and unclassified excavation. This project lasted one season, however, it took multiple pieces of equipment including two graders, one bulldozer, and two quad tracks. Highway 100 ran a span of nearly 20 miles.