Arlington Public Schools Track Facility

In the summer and early fall of 2022 Bowes Construction completed the Arlington Public Schools Track facility. This project required a few different services from Bowes Construction Inc.

First off, removals of the existing track took place as well as spot grading. The material that was removed, ended up being recycled for the project and other projects in the future. After removals, Bowes Construction focused on grading the site, along with adding and re-doing the special event areas such as long jump, high jump, etc. Following the completion of the special event areas, Bowes Construction proceeded with gravel laydown and compaction. Next, Bowes Construction proceeded to asphalt pave the track to prepare for the top rubber track coat. Special thanks to Arlington Public School District as well as Civil Design Inc. for working with us on this project!

Scroll to Top