Highway 18
This was a two season 17-mile grading project for the SDDOT in Hutchinson, Turner Counties.
The scope of work consisted of but was not limited to:
- Removals
- Unclassified Excavation
- Option Borrow Excavation
- Muck Excavation
- Undercutting
- Base Course
- Base Course, Salvaged
- Salvage and Stockpile Asphalt Mix and Granular Base Material
- Structures
- Erosion Control
- Silt Fence