Highway 18

This was a two season 17-mile grading project for the SDDOT in Hutchinson, Turner Counties.

The scope of work consisted of but was not limited to:

  • Removals
  • Unclassified Excavation
  • Option Borrow Excavation
  • Muck Excavation
  • Undercutting
  • Base Course
  • Base Course, Salvaged
  • Salvage and Stockpile Asphalt Mix and Granular Base Material
  • Structures
  • Erosion Control
  • Silt Fence